Credibly reintermediate backend ideas for cross-platform models. Continually reintermediate integrated processes through technically sound intellectual capital. Holistically foster superior methodologies without market-driven best practices.
Abu dhabi midfield terminal

Scope of Work

  • Master System Integrator
  • Providing 200+ outsource expertise who will works directly as segonded to the Main contractors covering different fields as ( Special Systems, MEP, QA/QC, ORAT, FM, ICT & MSI) the MSI scope cover all systems under Division 27 & 28 which consist of a total of 39 systems. ( BLTS, CSE, FR, LAN, WLAN, SACS, SAN, LPR, ACVIS, BRS, CUPPS, FIDS, ED, CUSS, AODB, RMS, CMS, Clock, CSE, Telephione, WLAN, PAS, BMS, MATV, SCADA, PBB, HBS, communication cabling, BHS, etc..)
  • Project Scope: Engineering, Installation, Supervision, Testing, Commissioning, ORAT & Close-out
https://i0.wp.com/www.icad.com/wp-content/uploads/2023/02/Airport.jpg?resize=640%2C480&ssl=1

Scope of Work

  • Expansion of Current Terminal
  • Supply, Installation, Testing and Commissioning of Civil, MEP, ELV Works
  • Supply, Installation, Testing, and Commissioning of Perimeter Security, Façade, Film Protection and Bullet proof glass
  • Car Parking System
  • Passive Defense Systems
https://i0.wp.com/www.icad.com/wp-content/uploads/2026/01/Sharjah-internation-airport.webp?resize=640%2C480&ssl=1

Scope of Work

Scope Included:

Design-Build of Special Airport Systems, Information and Communication Technology (SAS/ICT) and Associated Works at Sharjah International Airport

IR8A0104-scaled
IMG_1968-scaled
IMG_1983-scaled

Scope of Work

  • Supply, Installation, Testing  & Commissioning of ICT Systems
  • Maintenance of 200 Nos Self Service Kiosk in Airports across the Kingdom
Lucknow International Airport

Scope of Work

  • Master System Integrator
  • Project Management Overall Program Management Design Review for Developing IRD & ICD Templates.
  • Coordination with Agencies (EPC Contractors, Non-EPC Contractors, Airport System Contractor, MEP Contractor) for Execution & Interfacing Coordination of Testing and Commissioning Test Witness and Final Approval From Adani Team to Ensure That All IT & No IT System Should be Integrated For Overall Performance & Governance.
NOIDA AIRPORT INDIA
NOIDA INTERNATIONAL AIRPORT

Scope of Work

  • Master System Integrator
  • Systems Integration Design
  • Integration Program Management
  • Integration of ICT
  • Airport Systems
  • Core Airport Systems Implementation and Integration